Texas Instruments TPS7B6850EVM LDO Evaluation Module (EVM)

Texas Instruments TPS7B6850EVM LDO Evaluation Module (EVM) helps designers evaluate the operation and performance of TPS7B6850-Q1 watchdog LDO. The TPS7B6850-Q1 is a monolithic integrated 40V 500mA watchdog LDO in the HTSSOP-28 package. The evaluation module monitors microcontroller or microprocessor power supplies in an automotive environment. The Texas Instruments TPS7B6850-Q1 has an integrated adjustable Power Good threshold and delay time. The watchdog LDO also has protection for overload and over-temperature.

Features

  • Watchdog LDO
  • Window watchdog and standard watchdog configurable
  • 500mA output current
  • 4 to 40V input voltage range

Board Layout

Mechanical Drawing - Texas Instruments TPS7B6850EVM LDO Evaluation Module (EVM)
Publié le: 2017-05-12 | Mis à jour le: 2022-05-06