Texas Instruments TPS7A78EVM-011 Evaluation Module

Texas Instruments TPS7A78EVM-011 Evaluation Module is a reference design for engineering demonstration and evaluation of the TPS7A78, non-isolated smart linear voltage regulator (LDO). The TPS7A78EVM-011 Evaluation Module features less than 10mW standby power consumption and is a 90VAC to 360VAC non-isolated power solution. The Texas Instruments TPS7A78EVM-011 is configured to be a reference design for engineering applications requiring current to a dynamic load of up to 100mA.

Features

  • Non-isolated power solution for 90VAC to 360VAC
  • Supports output voltages from 1.25V to 5V
  • Less than 10mW standby power consumption
  • Cap-drop capacitors can be 1/4th the size of traditional solutions
  • Power Good

Layout

Location Circuit - Texas Instruments TPS7A78EVM-011 Evaluation Module

Schematic

Schematic - Texas Instruments TPS7A78EVM-011 Evaluation Module
Publié le: 2019-05-20 | Mis à jour le: 2023-11-21