Texas Instruments TPS2663-166EVM Evaluation Module

Texas Instruments TPS2663-166EVM Evaluation Module enables evaluation of the TPS26633 and TPS16630 eFuses. The TPS26633 is a 4.5V to 60V, 6A eFuse with overvoltage, under-voltage, short-circuit and reverse current blocking protection. The TPS16630 is 4.5V to 60V, 6A eFuse with overvoltage, under-voltage, and short-circuit protection. The TPS26633 and TPS16630 eFuses feature an integrated 31mOhm FET and are available in a PWP package.

The Texas Instruments TPS2663-166EVM Evaluation Module has two channels, CH1 and CH2. CH1 is used with the TPS26633 eFuse, whereas CH2 is used with the TPS16630 eFuse.

Features

  • 4.5 to 60V operating voltage range
  • 0.6A to 6A current limit programmable using onboard jumpers
  • Programmable output slew rate control, UVLO, and OVP
  • Output Power Limiting Scheme (TPS26633 only)
  • Reverse Input Polarity Protection up to -60V using external N-Channel MOSFET (TPS26633 only)
  • Load protection from Surge and EFT (IEC61000-4-5 and IEC61000-4-4) (TPS26633 only)

Applications

  • Factory automation and control
  • Motor drives
  • Active antenna systems and remote radio units
  • Industrial printers
  • Electronic circuit breakers

Layout

Location Circuit - Texas Instruments TPS2663-166EVM Evaluation Module
Publié le: 2019-12-11 | Mis à jour le: 2024-02-12