Texas Instruments LM76202-Q1EVM Ideal Diode Evaluation Module (EVM)
Texas Instruments LM76202-Q1EVM Ideal Diode Evaluation Module (EVM) allows reference circuit evaluation of the LM76202-Q1. The Texas Instruments LM76202-Q1 is a compact 4.2V to 55V, 2.23A ideal diode with programmable under-voltage, reverse-polarity protection, reverse current blocking, current limiting, and output current monitoring features.Features
- 4.5 to 55V operating voltage range (without TVS on input)
- 4.5 to 32V operating voltage range (with TVS on input for Surge protection)
- Load protection from transients: ISO 7637-2 Pulse 1 and ISO 16750-2 Pulse 5b
- Protection from short to the battery and short to GND
- 0.2A to 2.23A current limit programmable using onboard jumpers
- Programmable UVLO and output over-voltage
Applications
- Automotive ECU protection
- Camera Supply Protection
- Telematics
- Industrial Transport
Setup